Wuxi Xianglong Plastic Technology Co., Ltd.

Wuxi Xianglong Plastic Technology Co., Ltd.

Manufacturer from China
Verified Supplier
3 Years
Home / Products / Cooling Tower Fins /

750mm Cooling Tower Fins Cross Flow Cooling Tower Fill Replacement

Contact Now
Wuxi Xianglong Plastic Technology Co., Ltd.
Visit Website
City:wuxi
Province/State:jiangsu
Country/Region:china
Contact Person:MsYaling
Contact Now

750mm Cooling Tower Fins Cross Flow Cooling Tower Fill Replacement

Ask Latest Price
Video Channel
Brand Name :XL
Model Number :XL-750-LCHI
Certification :SGS
Place of Origin :Jiangsu, China
MOQ :10 square meters
Price :$1.2-2/square meters
Payment Terms :Western Union, T/T, MoneyGram, D/P, D/A, L/C
Supply Ability :1000m2/per pay
Delivery Time :10 working days
Packaging Details :Wooden,cartons,custom package
Condition :New
Cooling Type :Cooling Tower Parts
Material :PVC,PP,CPVC
Warranty :1 Year
Name :width 750mm cross flow cooling tower filling fill infill material
Width*Length :750*800/750*2000/750*1600
Wave Height :19-20mm
Usage :Cooing Tower
MOQ :10 square meters
Thickness :0.32-0.6mm
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

width 750mm cross flow cooling tower filling fill infill material

Description:

Cooling tower infill is one of the most important components for exchange of gas and water in cooling tower.

It is the major parts to improve the efficiency of cooling tower and make sure the economy and safe operation. With the development of the plastic industry,countercurrent tower drench water plastic packing "S" shape ladder wave, inclined corrugated fills, which has the heat dissipation, durable, good performance, ventilated small.

resistance, based on the easy and other advantages. It is widely used in different types of large, medium, small, cooling tower.


Specifications:
Tech Date
Sheet Width(mm) 750mm
Sheet Length 750*800/750*1600/750*2000mm
Thickness 0.32-0.6mm/customized
Sheet Spacing 19-20mm
Color grey/white/black
Material PP/PVC/CPVC

The performance of cooling tower packing directly affects the cooling effect of cooling tower, which is the core part of the whole cooling cycle system. This product introduces new automatic plastic vacuum forming machine.

Heat dissipation material adopt thin film design, in order to increase the heat dissipation area and reduce the wind resistance heat dissipation material surface exploring point corrugated guide trough, uniform arrangement direction down and consider the Angle of the air flow to drive the water film, so that the drain caustic heat dissipation along the surface of the heat dissipation material according to a certain flow rate down more effective effect. Heat dissipation material adopts senior PVC plastic material and is made by vacuum forming.

The cooling material is laminated as a whole group, with the same distance between each cooling material to facilitate air flow through. To ensure the best cooling effect.

750mm Cooling Tower Fins Cross Flow Cooling Tower Fill Replacement

Related Cooling Tower Film Fill

750mm Cooling Tower Fins Cross Flow Cooling Tower Fill Replacement

Advantages:

Liangji Cooling Tower Fill Suspended Liangji Packing Size 800*750


*It has the characteristics of light weight, high strength, good flame retardant performance, corrosion resistance, advanced design, small ventilation resistance, strong hydrophilicity, and large contact area.

*Geometric deformation does not occur under the conditions of 60℃-35℃.

*It will not be broken or brittle under the design low temperature conditions.

*Under normal operation and use conditions, its life is not less than 20a.

*High thermal performance, reaching the above, far exceeding the requirements of 90% of the national standard;

*The floating water rate is lower than 0.001% of the circulating water volume, and it adopts the three-in-one design of its own water collector and air inlet louver; the filler is made of flame retardant PVC vacuum plastic,

*Has good flame retardant properties.

PACKING AND DELIVERY

750mm Cooling Tower Fins Cross Flow Cooling Tower Fill Replacement

About US

750mm Cooling Tower Fins Cross Flow Cooling Tower Fill Replacement

750mm Cooling Tower Fins Cross Flow Cooling Tower Fill Replacement

750mm Cooling Tower Fins Cross Flow Cooling Tower Fill Replacement

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

Inquiry Cart 0